• Log In
  • Register
Site logo
Sticky header logo
Site logo
  • HOME
  • TARGETS & GOVERNANCE
  • PROJECTS
  • WORKING GROUPS
    • WG 1 – WATERWAY AND PORT INFRASTRUCTURE & MANAGEMENT
    • WG 2 – BUSINESS DEVELOPMENT
    • WG 3 – FLEET MODERNISATION
    • WG 4 – RIVER INFORMATION SERVICES
    • WG 5 – EDUCATION & JOBS
    • WG 6 – ADMINISTRATIVE PROCESSES
  • STEERING GROUP
  • DOCUMENTS
  • PHOTOS
  • CONTACT US
  • Projects

Rehabilitation and development of the Oltenița Port infrastructure (phase 1)

September 26, 2017in Projects 0 Likes

BASIC  PROJECT  DATA

Project ID: PA1A051

 

NEED  AND  ADDED  VALUE  FOR  THE  DANUBE  REGION  STRATEGY

The Oltenita port is located on the Danube River, on the pan-European transport corridor VII. There is growth potential at the Oltenita Port if the river traffic could be carried out to a greater extent by the large industrial units in the region with the increase in the port’s capacity to handle cargo, considering the construction of Danube – Bucharest channel.

Oltenita port is part of the TEN-T comprehensive network.

 

OBJECTIVE(S)  OF  THE  PROJECT

Modernization of the Oltenița port infrastructure. Phase 1 is already concluded.

 

CONDUCTED  PROJECT  ACTIVITIES

The following works were executed for the rehabilitation and modernization of port infrastructure:

  • Vertical quay (it was constructed using Larsen sheet piling) at the berths 1 and 2 area, with a total length of 170m
  • Modernisation of sloped quays L= 200m (berths 7 and 8)
  • Execution of a jetty quay L = 80m (berth 8)
  • Rehabilitation of existing sloped quays L = 425m
  • Modernization of the illumination network for the berths 1,2,3 and 8
  • Improvement of the supply networks for drinking water, water for firefighting, pluvial sewerage

 

TRANSBOUNDARY  IMPACT

Improvement of traffic conditions between Romania and other countries in the Danube region by increasing the port capacity of cargo handling and storage (future development of a container terminal by public-private partnership).

 

PROJECT  BENEFICIARIES  /  TARGET  GROUPS

Beneficiary: National Company Danube River Ports Administration SA Giurgiu
Target groups: shipping companies, port operators, industry

 

 

STATUS  AND  TIMEFRAME

Start date: 2012
End date: 2016
The project is already concluded.

 

NOTES

The project D. A. N. U. B. E. – Danube Access Network – Unlocking Bottlenecks in Europe, by developing a high-quality TEN-T ports infrastructure in Romania on optimal economic terms (Feasibility Study phase), financed from the TEN-T programme, prepared the future investments for the infrastructure modernization in Oltenita Port.

The feasibility study was finished in December 2009 and updated in August 2011.

 

 

FINANCING

Total budget: 4.81 MEUR
EU funds: 3.61 MEUR were funded by the Operational Programme ‘Transport’ (SOPT) 2007 – 2013 (ERDF)
National funds: 1.2 MEUR

 

 

PROJECT  TEAM

Project leader: National Company Danube River Ports Administration SA Giurgiu / Romania
(website: www.apdf.ro)
Address: Portului Street, no.1, Giurgiu / Romania
Contact data: ;

 

 

PROJECT  ENVIRONMENT

STRATEGIC  REFERENCE

  • General Transport Master Plan for Romania, approved by the Government Decision no. 666/206
  • Navigation and Inland Waterway Action and Development in Europe (NAIADES) COM (2006) 6 final
  • White Paper Roadmap to a Single European Transport Area – Towards a competitive and resource efficient transport system COM(2011) 144 final
  • Large Infrastructure Operational Programme 2014 – 2020
  • Government Programme 2017 – 2020

 

RELEVANT  LEGISLATION

  • Regulation (EU) No 1315/2013 of the European Parliament and of the Council of 11 December 2013 on Union guidelines for the development of the trans-European transport network and repealing Decision No 661/2010
  • Low no. 203/2003 regarding the guidelines for the creating, development and modernization of transport network  of national and international importance
  • Government Decision no. 907/2016 regarding the phases of the elaboration and the framework content of the technical and economic documentation related to the public-financed investment objectives / projects
  • Commission Regulation (EU) 2017/1084 of 14 June 2017 amending Regulation (EU) No 651/2014 as regards aid for port and airport infrastructure, notification thresholds for aid for culture and heritage conservation and for aid for sport and multifunctional recreational infrastructures, and regional operating aid schemes for outermost regions and amending Regulation (EU) No 702/2014 as regards the calculation of eligible costs

 

 

EUSDR  EMBEDDING

 

 

EUSDR  COMPLIANCE

 

 

OTHER  RELEVANT  ISSUES

FOLLOW – UP  PROJECT

The future development of a container terminal by public-private partnership.

 

 

META  DATA

Data provided by: Cristina Cuc and Monica Patrichi (Ministry of Transport and Infrastructure, Romania) – 13.09.2011
Last update by: Monica Patrichi (Ministry of Transport, Romania) – 20.09.2017

Download pdf

0 Likes

Newsletter

 


Disclaimer
Privacy policy

Share this:

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT