• Log In
  • Register
Site logo
Sticky header logo
Site logo
  • HOME
  • TARGETS & GOVERNANCE
  • PROJECTS
  • WORKING GROUPS
    • WG 1 – WATERWAY AND PORT INFRASTRUCTURE & MANAGEMENT
    • WG 2 – BUSINESS DEVELOPMENT
    • WG 3 – FLEET MODERNISATION
    • WG 4 – RIVER INFORMATION SERVICES
    • WG 5 – EDUCATION & JOBS
    • WG 6 – ADMINISTRATIVE PROCESSES
  • STEERING GROUP
  • DOCUMENTS
  • PHOTOS
  • CONTACT US
  • Projects
  • Uncategorized

Construction of intermodal infrastructure in the Port of Osijek

August 28, 2017in Projects 0 Likes

BASIC  PROJECT  DATA  –  PROJECT  IDEA

Project ID: PA1A104

 

NEED  AND  ADDED  VALUE  FOR  THE  DANUBE  REGION  STRATEGY

The Port of Osijek is located in the City of Osijek, administrative centre of Osijek-Baranja County. The county, being a regional government unit, is situated in the north-eastern part of the country, in the Pannonian region, covers an area of 4.155 km2 and comprises 7.3% of Croatia’s total territory.

The project will stimulate growth and employment in the whole area by ensuring integrated cargo transhipment at one single port.

 

OBJECTIVE(S)  OF  THE  PROJECT

Through the implementation of this project some economical, social and ecological results will be achieved there as well. They are:

  1. Increasing traffic on the Drava and Danube
  2. Creating opportunities for development of intermodal hub and economic zone
  3. Development of intermodal transport system including the connection of inland waterways to sea ports, road and rail routes

 

PLANNED  PROJECT  ACTIVITIES

The feasibility study is planned to be finished in 2018

The planned construction can be divided into three basic components:

  1. The construction of coastal structures involves arranging the right bank of the Drava river in the length of approximately 2,220 m to protect against flooding.
  2. Filling the terrain and the retaining wall: The western part of Osijek port must be filled in order to ensure conditions for further use of space for infrastructure and economic purposes.
  3. The construction of infrastructure covers the construction of storm-water and sanitary sewage system, construction of roads, rail tracks, lighting and electricity supply.

The project covers an area of 92 ha.

 

TRANSBOUNDARY  IMPACT

As transport of goods on the Danube and its tributaries has a cross-border character, the entire Danube region will benefit from building infrastructure in the Port of Osijek.

Due to its transboundary character the project will benefit a wide range of stakeholders from different countries as shipping companies as well as companies conducting business in Osijek-Baranja county.

 

PROJECT  BENEFICIARIES  /  TARGET  GROUPS

  • Shipping companies and port oparators
  • Companies conducting business in the Osijek-Baranja County and also in wide region
  • Inhabitants living in the Osijek-Baranja county

 

 

STATUS  AND  TIMEFRAME

Start date: 2019
End date: 2021

 

NOTES

The project is currently being prepared.

  • Preliminary and main design finished
  • Location permit issued
  • EIA finished

 

 

FINANCING

Total budget: 58,000,000 EUR (estimated cost according to preliminary design)
Funding is not yet available.

 

 

PROJECT  TEAM

Project leader: Port Authority Osijek (website: www.port-osijek.hr)
Address: Šetalište kardinala F.Šepera 6, 31000 Osijek / Croatia
Contact data: 

No additional partners are involved in this project.

 

 

PROJECT  ENVIRONMENT

PROJECT  CROSS – REFERENCE

Building and reconstruction of the south quay in Port of Osijek (PA1A103)
Construction of bulk cargo terminal in the Port of Osijek (PA1A102)

 

STRATEGIC  REFERENCE

  • Europe 2020 Strategy
  • An Integrated European Action Programme for Inland Waterway Transport (NAIADES) COM (2006) 6 final
  • White Paper Roadmap to a Single European Transport Area – Towards acompetitive and resource efficient transport system COM(2011) 144 final
  • Transport Development strategy of the Republic of Croatia 2014-20130
  • Operational Programme Competetiveness and Cohesion 2014-2020

 

RELEVANT  LEGISLATION

  • AGN – European Agreement on Main Inland Waterways of International Importance

 

 

EUSDR  EMBEDDING

 

 

 

EUSDR  COMPLIANCE

 

 

OTHER  RELEVANT  ISSUES

PROJECT  REQUIREMENTS

The feasibility study with CBA must be finished.

 

 

META  DATA

Data provided by: Ana Barišić (Ministry of Maritime Affairs, Transport and Infrastructure / Croatia) – 28.03.2013
Last update by: Ana Barišić (Ministry of Maritime Affairs, Transport and Infrastructure / Croatia) – 24.08.2017

Download pdf

0 Likes

Newsletter

 


Disclaimer
Privacy policy

Share this:

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT