Rehabilitation of locks on the Danube-Black Sea Canal and the Poarta Alba-Midia Navodari Canal

August 22, 2017in Projects 0 Likes

BASIC  PROJECT  DATA

Project ID: PA1A034

 

NEED  AND  ADDED  VALUE  FOR  THE  DANUBE  REGION  STRATEGY

The locks on the Danube – Black Sea Canal (namely Cernavoda and Agigea) and on the Poarta Alba – Midia Navodari Canal (namely Ovidiu and Navodari) are part of the TEN-T core network. Their reliable operation is crucial for inland waterway transport on both canals.

 

OBJECTIVE(S)  OF  THE  PROJECT

The general objective of the project is to ensure the availability, reliability and safety of navigation on the two channels (CDMN and CPAMN), providing thus a sustainable alternative to road transport along an important national and international route.

In the contract “Technical Assistance for improving the navigation conditions on the Romanian-Bulgarian common sector of the Danube and related studies”, Section III covers the Danube–Black Sea Canal and Poarta Alba–Midia Navodari Canal (branching from the Danube-Black Sea Canal to the seaport of Midia). Thus, in this section a feasibility study was completed on upgrading the equipment and facilities of locks, taking into account their age, namely:

  • Equipment and installations are older than 27 years
  • Pumping-station equipment is older than 43 years

According to the project, the initial life-span of the equipment and facilities is:

  • 15 years for control and drive systems hydraulics
  • 12 years for electrical installations
  • 24 years for metal structures (gates, sluices, bridges)

Design year of equipment is 1978.

 

PLANNED  PROJECT  ACTIVITIES

The project includes:

  • Rehabilitation of Cernavoda and Agigea locks
  • Rehabilitation and upgrading of the basic auxiliary equipment serving these locks, namely: the main pumping station in Cernavoda (SPC) and other pumping stations protecting villages against flooding
  • Rehabilitation of Ovidiu lock including the high water galleries
  • Rehabilitation of the high water galleries of the Navodari lock

The project specifically involves:

  • Modernization of lock basic technological equipment (gates, valves, control, action and automatic installation, control and supervision installation, hydraulic installation, etc.)
  • Modernization of lock auxiliary equipment: de-watering installation, power supply and distribution installation, generator, lighting installations, etc.
  • Rehabilitation of lock’s construction part (waterproofing, technological chambers, technological spaces, etc.)
  • Installation of equipment for the lock safety (TVCI equipment, traffic light signalling systems for locks, fire extinguishing systems, bollards etc.)
  • Modernization of the pumping units

 

TRANSBOUNDARY  IMPACT

On the Danube–Black Sea Canal and Poarta Alba–Midia Navodari Canal goods are transported by ships flying different flags.

 

PROJECT  BENEFICIARIES  /  TARGET  GROUPS

  • Shipping companies
  • Communities surrounding waterways

 

STATUS  AND  TIMEFRAME

Start date: 2013
End date: 2019

 

NOTES

Feasibility study was finalised in 2011. The financing application was submitted in 2012 to the Management Authority for SOPT 2007–2013.

The project  was split to be implemented in two phases, namely:

  • Phase 1 financed through Sectorial Operational Programme Transport 2007-2013 (SOPT) (finalised in 2016)
  • Phase 2 financed through Large Infrastructure Operational Programme 2014-2020 (POIM), is ongoing

 

 

FINANCING

Total budget: 228,613,798 EUR for phase 1
119,734,240 EUR for phase 2 (estimated)
EU funds: 156,379,303 EUR were funded in phase 1 through the Operational Programme `Transport` (SOPT) 2007 – 2013;
phase 2 is co-funded by the Large Infrastructure Operational Programme 2014 – 2020
National funds: 72,234,494 EUR for phase 1

 

 

PROJECT  TEAM

Project leader: Administration of Navigable Canals (ACN), Constanţa / Romania
(website: www.acn.ro)
Address: Ecluzei Street no. 1, Agigea / Romania

There would be no additional partners involved.

 

 

PROJECT  ENVIRONMENT

STRATEGIC  REFERENCE

  • Strategy for sustainable development on the period 2007–2013 and 2020, 2030 approved by Minister of Transport Order no. 508/2008
  • Government Programme 2013 – 2016
  • Navigation and Inland Waterway Action and Development in Europe (NAIADES) COM (2006) 6 final
  • White Paper Roadmap to a Single European Transport Area – Towards a competitive and resource efficient transport system COM(2011) 144 final

 

RELEVANT  LEGISLATION

  • Decision no. 661/2010/EU of the European Parliament and of the Council of 7 July 2010 on Union guidelines for the development of the trans-European transport network
  • Low no. 203/2003 regarding the guidelines for the creating, development and modernization of transport networkof national and international importance
  • Government Decision no. 599/2009 regarding the organisation of the National Company “Navigable Canals Administration”

 

OTHER

Feasibility study was finalised in 2011.

Gov. Decision no.376 / 2013 for approval of the technical and economic indicators of the investment.

 

 

EUSDR  EMBEDDING

 

 

EUSDR  COMPLIANCE

 

 

META  DATA

Data provided by: Cristina Cuc, Monica Patrichi (Ministry of Transport and Infrastructure, Romania) – 13.09.2011
Last update by: Adina Hilca (Administration of the Navigable Canals SH, Romania) – 21.08.2017

Download pdf.

0 Likes

Newsletter

 


Disclaimer
Privacy policy

Share this:

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT