Galati Multimodal Platforms – Stage I – Upgrading of the waterside infrastructure

December 10, 2021in Projects 0 Likes

BASIC  PROJECT  DATA

Project ID: PA1A169

Project website: https://www.romanian-ports.ro/proiecte_ext/site_PMG/pmg_en.php#

NEED  AND  ADDED  VALUE  FOR  THE  DANUBE  REGION  STRATEGY

The port of Galati infrastructure upgrade will contribute to enhance the connections between different countries such as Ukraine, Moldova and Romania allowing an increase of freight transport along the lower section of the Danube and the overall Rhine-Danube core network corridor.

 

OBJECTIVE(S)  OF  THE  PROJECT

The general objective is to foster the use of inland waterway and maritime transport on the Rhine-Danube Corridor, by upgrading the basic port infrastructure and supporting transhipment operations in the Port of Galati.

 

 

CONDUCTED  AND  PLANNED  PROJECT  ACTIVITIES

The project “Galati Multimodal Platforms – Stage I – Upgrading of the waterside infrastructure” is the first stage of the project “Multimodal Platform Galati – removing major bottlenecks by substantially upgrading existing infrastructure and bridging missing links for the Rhin – Danube / Alpine Core Networks Corridor” and aims to upgrade the waterside infrastructure of the port of Galati – Port Bazinul Nou area, located within the port of Galati.

Stages to achieve the general objective:

  • Drawing technical design and execution details following the execution of investment object: (1) Quay / unloading area, (2) Multimodal platforms – infrastructure (platforms, roads, utility networks) and superstructure (buildings, additional areas of storage), existing and newly created equipment and port facilities, (3) road and rail connection access to multimodal platforms, (4) the access platform area;
  • Capital dredging works in the basin located in the “Port Bazinul Nou” area to allow safe entry of vessels;
  • Upgrade of the existing quay to perform direct loading and unloading operations of Intermodal Loading Units (ILUs) between vessels and the quay;
  • Partial filling of the port basin to create additional space for berthing and future handling operations;

Levelling of the elevation profile of the platform.

 

 

PROJECT  BENEFICIARIES  /  TARGET  GROUPS

Beneficiary:

  • CN APDM SA Galati (Project Coordinator)
  • Metaltrade Inernational SRL (Project Partner)
  • Port Bazinul Nou SA (Project Partner)

Direct target groups:

  • shipping companies,
  • port operators,
  • industry

 

 

STATUS  AND  TIMEFRAME

Start date: July 2017
End date: December 2021

 

 

FINANCING

Total budget:  25,619,781 EUR
EU funds: 21,776,814 EUR co-financed through CEF “Connecting Europe” funding
National funds: 3.450.053 EUR
Own contribution: 392,914 EUR 

 

 

PROJECT  TEAM

Project leader:

  • Compania Naţională „ADMINISTRAŢIA PORTURILOR DUNĂRII MARITIME” SA (CN APDM SA) Galati

Address:

Strada Portului Palatul Navigaţiei 34,
RO- 800025 Galați

 

Project Partners:

  • Metaltrade Inernational SRL
  • Port Bazinul Nou SA

 

 

EUSDR  EMBEDDING

EUSDR  COMPLIANCE

META  DATA

Data provided by: viadonau (10.11.2021) based on information from the project website

Download pdf.

0 Likes

Newsletter

 


Disclaimer
Privacy policy

Share this:

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT