Removal of the sunken German fleet from the World War II in sector Prahovo

October 22, 2018in Projects 0 Likes

BASIC  PROJECT  DATA

Project ID: PA1A073

 

NEED  AND  ADDED  VALUE  FOR  THE  DANUBE  REGION  STRATEGY

Downstream of the Ðerdap II dam at Prahovo a large graveyard of shipwrecks is present along the border between Serbia and Romania. These wrecks date from the end of the Second World War when these vessels were left behind and sunk by retreating German forces. The exact number of vessels which are located on this stretch is unknown, but 23 sunken vessels have an influence on the safety of navigation, since their presence narrows the minimum fairway width of 180m to 100m during low water seasons. Since the sunken ships are part of the German war fleet, there are unexploded ordnance (UXO) and Explosive Ordnance Disposals (EODs) on board of them, which present constant danger for human lives, the environment and are threatening navigation, in particular in cases where hazardous substances are transported (such as oil, gases, flammable substances, etc.). The vessels and the unexploded ordnance have to be removed.

 

Some of the vessels are partly positioned within the fairway and passing ships need to sail very cautiously on this section, as a collision between vessels and wrecks may result in calamities and even cause the explosion of ordnance. The navigation situation is characterised as hazardous, especially during periods of low water.

 

OBJECTIVE(S)  OF  THE  PROJECT

The project’s objective is to improve the conditions for safe navigation on the Danube (sector Prahovo), in particular during the low water level periods by removal of the German sunken vessels from WW II.

 

The Ministry of Construction, Transport and Infrastructure, in cooperation with the German Government and the United Nations Development Program (UNDP), initiated the first phase of this project which includes the searching for and the removal of the UXO on boards of these ships.

 

In July 2017, the site was visited by specialized German divers. Based on their analysis and work plan the removal of UXO on boards of all these ships will be conducted during 2018. The costs of implementing this first phase of the project have been estimated to amount to approximately EUR 2 million and funding required will be provided from the State Budget.

 

Following the removal of UXOs, the technical documentation and tender dossier will be updated. The Ministry of Construction, Transport and Infrastructure has provided financial and technical assistance for these activities through the PPF8 Project. Based on the updated technical documentation and tender dossier, the Ministry of Construction, Transport and Infrastructure will apply for funding for the second phase of this project, which includes the removal of the demined sunken vessels.

 

PLANNED  PROJECT  ACTIVITIES

  1. Phase: Removal of unexploded ordnance
  2. Phase: Removal of sunken vessels

TRANSBOUNDARY  IMPACT

The whole inland navigation sector in the Danube Region will benefit from the planned measures. River traffic on the Serbian part of the Danube is mainly transit from the Black Sea to Hungary, Austria and Germany. Consequently, there is a large benefit for the EU to keep this corridor functional and guarantee safe and efficient navigation. Resolved bottlenecks in one sector of the Danube have a positive impact on all Danube riparian states involved in inland navigation.

Moreover, due to the ongoing corrosion of the vessels leakage of contaminated materials might take place which is an environmental hazard.

 

PROJECT  BENEFICIARIES  /  TARGET  GROUPS

The users of the waterway are the main beneficiaries of the project.

 

 

STATUS  AND  TIMEFRAME

Start date: 2017
End date: at the earliest 2022

 

NOTES

Project and tender documentation were already done in 2006, financed by the CARDS Program (pre-IPA). The vessels were not removed. Deadline for the removal of UXO: December 2018

 

 

FINANCING

Total budget: EUR 22 million (estimation)

EUR 2 million for the removal of UXO
EUR 20 million for the removal of sunken ships
state funds and possibly IPA or other EU fund

 

 

PROJECT  TEAM

Project leader: MCTI – Directorate for Inland Waterway (Plovput) / Serbia
(website: www.plovput.rs)
Address: Francuska 9, 11000 Belgrade / Serbia

Project partners: German Government and the United Nations Development Program (UNDP)

 

 

PROJECT  ENVIRONMENT

PROJECT  CROSS – REFERENCE

  • To remove shipwrecks, bridges debris and unexploded weapons from the riverbed of the Danube (project example in EUSDR Action Plan)
  • Danube Shipwreck Removal (DSWR) – PA1A033

 

STRATEGIC  REFERENCE

Serbian strategic Framework:

  • Master Plan for IWW Transport in Serbia (2006)
  • Serbian Transport Development Strategy for Period 2008-1015 (2008)
  • General Master Plan for Transport in Serbia (2009)

 

 

EUSDR  EMBEDDING

 

 

EUSDR  COMPLIANCE

 

 

OTHER  RELEVANT  ISSUES

PROJECT  REQUIREMENTS

Sufficient funding for the removal of the vessels

 

ANY  OTHER  ISSUES

The Danube is an international waterway and inevitably the successful completion of the project should increase the use of the waterway and reduce transit times. The sustainability of the project will reflect establishing uninterrupted navigation conditions on the Danube in Serbia and providing increased transport capacity and reducing transport time and river accidents and, which should save costs.

 

 

META  DATA

Data provided by: Ivan Mitrovic (Plovput / Serbia) – 09.03.2012
Last update by: viadonau, based on information provided by the Serbian Ministry of Transport in 2018 – 11.09.2019

 

Download pdf.

0 Likes

Newsletter

 


Disclaimer
Privacy policy

Share this:

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT