Waiting berth for the dismantling/remaking of pushed convoys at the junction between the Danube–Black Sea Canal and the Poarta Alba–Midia Navodari Canal

July 10, 2017in Projects 0 Likes

BASIC  PROJECT  DATA

Project ID: PA1A035

 

NEED  AND  ADDED  VALUE  FOR  THE  DANUBE  REGION  STRATEGY

The waiting berth is located on the left bank of the Danube–Black Sea Canal (DBSC), upstream from the junction with the Poarta Albă–Midia Năvodari Canal (PAMNC), between km 29+720 and 30+020. The waiting berth for the dismantling/remaking of pushed convoys was designed at the same time as the design of both canals. The project was foreseen in the initial project design of the Danube–Black Sea Canal as a functional necessity. The investment was not started due to the lack of financing.

It is of functional need for the transit of convoys, because of the difference in fairway parameters between the canals and the difference between the geometries of the convoys transiting the two canals. The navigation convoy for the DBSC is made up of 6 barges of 3,000 ton, in two lines, propelled by a pusher of 2 x 820 HP (L = 296 m; B = 22.80 m, D = 3.80 m). The navigation convoy for the PAMNC is made up of a 3,000 t barge with its pusher (L = 119.5 m; B = 11.40 m, D = 3.80 m).

The waiting berth is 300 m long. It has three piers and a quay depth of 5.5 m. Taking into account the current traffic and the traffic forecast for the following years, a capacity of dismantling/remaking of around 12 barges/day is estimated for the berth (the reference convoy is made up of two units).

 

OBJECTIVE(S)  OF  THE  PROJECT

The main goal of the waiting berth for convoys is to facilitate the convoys’ assembling/dismantling operations, including the assurance of cargo safety as well as the simple vessel’s mooring, and to lower the unit waterway transport cost. Given a lower unit cost, waterway transport will become more attractive (in comparison to road or rail alternatives) and the market equilibrium will shift to a higher transported volume.

 

CONDUCTED  PROJECT  ACTIVITIES

  • Feasibility study – finalised in February 2011
  • Financing Application for SOPT 2007–2013 : August 2011
  • Public tender for works and supervision: December 2011
  • Project implementation 2012–2014

 

TRANSBOUNDARY  IMPACT

Through the Danube–Black Sea Canal the Danube river is linked to the port of Constanta and goods are transported from/to Central European countries to/from Asian countries.

 

PROJECT  BENEFICIARIES  /  TARGET  GROUPS

Shipping companies

 

 

STATUS  AND  TIMEFRAME

Start date: 2012
End date: 2014
The project is already concluded.

 

 

FINANCING

Total budget: 3,500,000 EUR
EU funds: 2,020,000 EUR were funded by Operational Programme `Transport´ (SOPT) 2007 – 2013 (ERDF)
National funds: 1,480,000 EUR

 

 

PROJECT  TEAM

Project leader:  Administration of Navigable Canals (ACN), Constanta / Romania (website: www.acn.ro)
Address: Ecluzei Street no. 1, Agigea / Romania

No additional partners were involved.

 

 

PROJECT  ENVIRONMENT

PROJECT  CROSS – REFERENCE

  • The signalization on the Danube – Black Sea Canal was modernised in the period 2010–2011 (PA1A029)
  • Rehabilitation of locks on the Danube-Black Sea Canal and the Poarta Alba-Midia Navodari Canal (PA1A034)
  • Banks consolidation on the Danube–Black Sea Canal (PA1A028)
  • Modernizing the navigation signalization system on the Poarta Albă–Midia Năvodari Canal (PA1A066)
  • Banks consolidation on the Poarta Alba–Midia Navodari Canal (PA1A042)

 

STRATEGIC  REFERENCE

  • Strategy for sustainable development in the period 2007–2013 and 2020, 2030 approved by Minister of Transport Order  no. 508/2008
  • White Paper Roadmap to a Single European Transport Area – Towards a competitive and resource efficient transport system COM(2011) 144 final
  • Navigation and Inland Waterway Action and Development in Europe (NAIADES) COM (2006) 6 final

 

RELEVANT  LEGISLATION

  • Decision No 661/2010/EU of the European Parliament and of the Council of 7 July 2010 on Union guidelines for the development of the trans-European transport network
  • Low no. 203/2003 regarding the guidelines for the creating, development and modernization of transport network  of national and international importance
  • Government Decision no. 599/2009 regarding the organisation of the National Company “Navigable Canals Administration”
  • All EU Directives related to environmental protection

 

 

EUSDR  EMBEDDING

 

 

EUSDR  COMPLIANCE

 

 

 

META  DATA

Data provided by: Monica Patrichi (Ministry of Transport / Romania) – 24.03.2017

Download pdf

0 Likes

Newsletter

 


Disclaimer
Privacy policy

Share this:

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT