• NEWADA duo – Network of Danube Waterway Administrations – Data & User Orientation

    Transnational project (AT, SK, HU, HR, RS, RO, BG) The follow-up project of NEWADA further supported the waterway administrations of the Danube riparian states in achieving a common level of service in waterway management along the Danube and its navigable tributaries. The “NEWADA duo” approach of concerted waterway and information management procedures is crucial for…

  • NEWADA – Network of Danube Waterway Administrations (project example in EUSDR Action Plan)

    Transnational project (AT, SK, HU, HR, RS, RO, BG, UA) The NEWADA project aimed at intensifying the cooperation between the waterway administrations of the Danube region, in order to foster a coordinated and consistent approach to the waterway maintenance tasks of all administrations.

  • Improvement of the navigational systems and topo-hydrographic measurements on the Danube River – Phase 2

    National project (BG) Within the project the delivery of a specialized surveying vessel, including a boat for hydrographic measurements in shallow and narrow sections, has been implemented. The objective was to achieve international standards for implementation of topographic measurements, including hydrographical and hydrological activities necessary for studying the hydromorphological changes along the inland waterways.

  • DaHar – Danube Inland Harbour Development

    Transnational project (AT, SK, HU, SI, RS, BG) The project paved the way for inland harbours of small and medium-sized Danube cities to develop themselves in a coordinated, sustainable way with respect to their urban environment by utilising the logistical and multi-modal development capacities of their ports and port areas and by developing their ports…

  • Integrated River Engineering Project / Catalogue of Measures for the Danube East of Vienna

    National project (AT) The Catalogue of measures for the Danube east of Vienna is the result of an integrative planning process and a multi-year concept based on a pilot project phase, offering compatible solutions for both navigation and ecology. It includes the granulometric improvement of the river bed / sediment management, the new and re-construction…

  • Building and reconstruction of the south quay in the Port of Osijek

    National project (HR) This planned port infrastructure project foresees the construction and reconstruction of the south quay in the Port of Osijek. The four phases include the construction of basic ports infrastructure (rail tracks, roads, water supply system, electric power supply network, etc.), a container terminal, a RO-RO terminal and the reconstruction of the existing…

  • Construction of intermodal infrastructure in the Port of Osijek

    National project (HR) The planned port infrastructure project in the Port of Osijek foresees the construction of coastal structures, filling the terrain and the retaining wall and establishing basic infrastructure (waste-water sewage system, electricity network, roads, etc.)

  • Upgrade of Gabčíkovo locks

    National project (SK) Due to discontinuous operation of the Gabčíkovo locks, safe, reliable and quality navigation and especially passing the locks on the Slovak stretch of river Danube is not provided. Upgrade of the Gabčíkovo locks aims at the modernisation of Gabčíkovo locks and consequently the provision of continuous and stable navigation conditions for both…

  • EWENT – Extreme weather impacts on European networks of transport

    Transnational project (FI, NO, CY, UN, DE, AT) The project´s objective was the estimation and monetisation of disruptive effects of extreme weather events on the operation and performance of the EU transportation system.

  • Modernizing the navigation signalization system on the Danube–Black Sea Canal

    National project (RO) The objective of the conducted project was to modernize the navigation signalization system on the Danube–Black Sea Canal in order to ensure the safety of transport on the canal.