Home
Sticky header logo

Sign in

Login

Restore password

Please enter your username or email address.

You will receive a link to create a new password via email.

  • ABOUT US
    • TARGETS & ACTIONS
    • STEERING GROUP
      • STEERING GROUP MEETINGS
    • WORKING GROUPS
      • WORKING GROUP MEETINGS
    • KEY DOCUMENTS
  • NEWS
  • EVENTS
  • PROJECTS
  • E-MATERIALS
    • NEWSLETTERS
    • PHOTOS
  • CONTACT US
    • PRIORITY AREA COORDINATORS
Home
Sticky header logo
Home
Sticky header logo

Blog categories

  • 2012 (5)
  • 2013 (4)
  • 2014 (8)
  • 2015 (5)
  • 2016 (5)
  • 2017 (3)
  • 2018 (7)
  • 2019 (5)
  • 2020 (2)
  • 2022 (3)
  • 2023 (1)
  • News (6)
  • Projects (143)
  • Uncategorized (2)

Comments

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Projects

  • July 13, 2017

    High Performance Green Port Giurgiu Stage II – Construction

    National project (RO) The project is designed to transform Giurgiu Free Zone Port into a “High Performance Green Port” by upgrading its key infrastructure, connecting Inland Waterway Transportation (IWT) with the road and rail networks and stimulating IWT and related intermodal transportation.

  • July 11, 2017

    Improving navigation conditions on the Danube River from 1295.5 -1433.1 river km – Eliminating bottlenecks on the Croatian/Serbian part of Danube River

    National project (HR) The common Croatian and Serbian part of Danube river stretch from 1433.1 – 1295.5 rkm is considered critical in terms of navigation conditions and dissemination of sediment and ice. Therefore, the main objective of the project is to define the present situation through monitoring (ecological, hydro-morphological, water quality,… ), propose measures which…

  • July 11, 2017

    Removal of unexploded ordnance (UXO) from the Danube River sector Prahovo

    Transnational project (DE, RS) Restoring unhindered navigation on Serbian inland waterways by cleaning of UXO left behind after the NATO bombings in 1999 in the Danube and Sava rivers. According to the IWT Master Plan of 2008, there were 8 critical locations on the Danube and 4 on the Sava river.

  • July 11, 2017

    Construction of New Zezelj Bridge in Novi Sad

    Transnational project (ES, IT, RS) The old Zezelj bridge was destroyed in NATO air strikes in 1999. The temporary constructed bridge did not comply with the required standards of the Danube Commission and EU standards. The new Zezelj bridge (within the European Rhine-Danube Corridor) was reconstructed until 2018 at the same location using the foundation…

  • July 11, 2017

    Upgrade of the Danube between Straubing and Vilshofen: Variant-independent investigation on the development of the Danube waterway between Straubing and Vilshofen

    National project (DE) The Danube river section from Straubing to Vilshofen is a major bottleneck in the Trans-European Network. The task of this already concluded study was to examine the two remaining variants and to prepare technical and ecological planning for both variants. The aim was to bring about the final decision concerning the development…

  • July 11, 2017

    Upgrade of the Danube between Straubing and Vilshofen: Study for design, approval planning and public consultation within the frame of the planning approval procedure for subsection 1 (Straubing–Deggendorf)

    National project (DE) The Danube river section from Straubing to Vilshofen is a major bottleneck in the Trans-European Network. After conducting a variant study in 2013, policy-makers decided to pursue variant A. This follow-up study laid out the necessary preconditions to obtain the construction permissions and budget approvals for the upgrading of subsection 1 Straubing-Deggendorf.

  • July 11, 2017

    Rehabilitation, Improvement and Development of Transport and Navigation on the Sava River Waterway

    National project (HR) The Sava river is navigable on 594 km of its river course and links the economies of the four Sava riparian states (Serbia, Bosnia and Herzegovina, Croatia, Slovenia). This project will result in the improvement of the physical capacity of the Sava waterway and it will contribute to the improvement of mobility…

  • July 10, 2017

    Preparation of necessary documentation for river training and dredging works on selected locations along the Danube River in Serbia

    Transnational project (NL, DK, RS) Critical sections on the Danube River in Serbia are identified in the Master Plan for IWW Transport in Serbia (2006). River training works are needed in order to achieve fairway parameters which would improve navigation conditions in terms of safety. Necessary designs and tender documentation for river training works on…

  • July 10, 2017

    Banks protection on the Sulina Canal

    National project (RO) The project foresees further bank protection works on the Sulina Channel (on a length of 36.7 km), in addition to the works already concluded (lenght of 15km).

  • July 10, 2017

    Improving navigation conditions on the Danube between Calarasi and Braila (rkm 375–175)

    National project (RO) As a consequence of critical points on the Călăraşi – Brăila section of the Danube, vessels must take a bypass route via the Bala–Borcea branch, which extends the navigation distance to around 110 km, for periods of around 140 – 160 days/ year. The project therefore includes river engineering works which will…

Previous Page
1 … 10 11 12 13 14 15
Next Page

Newsletter

Sitemap
Contact us
Disclaimer
Privacy policy
Intranet

Image module
div#stuning-header .dfd-stuning-header-bg-container {background-size: initial;background-position: top center;background-attachment: initial;background-repeat: initial;}#stuning-header div.page-title-inner {min-height: 100px;}#main-content .dfd-content-wrap {margin: 0px;} #main-content .dfd-content-wrap > article {padding: 0px;}@media only screen and (min-width: 1101px) {#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars {padding: 0 0px;}#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars > #main-content > .dfd-content-wrap:first-child,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars > #main-content > .dfd-content-wrap:first-child {border-top: 0px solid transparent; border-bottom: 0px solid transparent;}#layout.dfd-portfolio-loop > .row.full-width #right-sidebar,#layout.dfd-gallery-loop > .row.full-width #right-sidebar {padding-top: 0px;padding-bottom: 0px;}#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars .sort-panel,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars .sort-panel {margin-left: -0px;margin-right: -0px;}}#layout .dfd-content-wrap.layout-side-image,#layout > .row.full-width .dfd-content-wrap.layout-side-image {margin-left: 0;margin-right: 0;}
PA 1A
Manage Consent

To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.

• Page and file requests are generally logged on the server for 14 days.
• Entries in forms are processed electronically by us. Personal data in the forms used to respond to your enquiry ((pre-)contractual communication in accordance with Art. 6 Abs 2 lit b GDPR) is processed.
• Your data protection decision is stored in cookie complianz in your browser for 90 days.

Functionally necessary cookies Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network. The data processing activities undertaken by employing the use of cookies are based on our legitimate interests in providing a fully functioning website and the services requested by you (Article 6(1)(f) GDPR, Section 96 para. 3 of the Telecommunications Act). We use the following cookies: • danube-region.eu web service / WordPress (CMS): necessary to transmit messages and provide the services requested by you. • Cookie consent: this cookie stores the settings you have made as a user in this cookie consent process. • Session cookie: Necessary to uniquely identify your session and, if necessary, to store settings you make on the website or, for example, in a form.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Analysis and statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you. Google Analytics (GA): Google LLC (USA) registers a unique ID that is used to generate statistical data on how visitors use the website. ExactMetrics: MonsterInsights LLC (USA) is a Google Analytics plugin for WordPress websites that simplifies the process of setting up and viewing Google Analytics data directly within the WordPress dashboard.
Embedded content from other websites
Posts on this website may contain embedded content (e.g. videos, images, posts, etc.). Embedded content from other websites behaves exactly as if visitors had visited the other website. These websites may collect data about you, use cookies, embed additional third-party tracking services and record your interaction with this embedded content, including your interaction with the embedded content if you have an account and are logged in to that website.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}