Home
Sticky header logo

Sign in

Login

Restore password

Please enter your username or email address.

You will receive a link to create a new password via email.

  • ABOUT US
    • TARGETS & ACTIONS
    • STEERING GROUP
      • STEERING GROUP MEETINGS
    • WORKING GROUPS
      • WORKING GROUP MEETINGS
    • KEY DOCUMENTS
  • NEWS
  • EVENTS
  • PROJECTS
  • E-MATERIALS
    • NEWSLETTERS
    • PHOTOS
  • CONTACT US
    • PRIORITY AREA COORDINATORS
Home
Sticky header logo
Home
Sticky header logo

Blog categories

  • 2012 (5)
  • 2013 (4)
  • 2014 (8)
  • 2015 (5)
  • 2016 (5)
  • 2017 (3)
  • 2018 (7)
  • 2019 (5)
  • 2020 (2)
  • 2022 (3)
  • 2023 (1)
  • News (6)
  • Projects (143)
  • Uncategorized (2)

Comments

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Projects

  • September 29, 2018

    Rehabilitation of the critical sectors on the Sava River

    National project (RS) The main objective of the project is to provide the prescribed fairway parameters on the Sava river between Belgrade and the border with Croatia (Serbian Sava stretch). On this river stretch five major bottlenecks will be removed until 2020.

  • September 28, 2018

    Deepening of the fairway of the Upper Main

    National project (DE) The upgrade of the Upper Main to class Vb is intended to enable a fairway depth of 2.9m, increasing the possible depth by 4 dm. Planning, approval and construction phases are conducted subsequently for different sections and are expected to be completed by 2020.

  • September 28, 2018

    Deepening of the fairway of the Lower Main

    National project (DE) Sole objective of this infrastructure project is the deepening of the fairway on the Lower Main between the Rhine mouth (rkm 0.0) and Aschaffenburg (rkm 84.5), in order to enable a draught of 3.1 m.

  • September 28, 2018

    Upgrade of the Danube between Straubing and Vilshofen: Pursuing Variant A

    National project (DE) Germany and Bavaria agreed on the realization of Variant A for the upgrade of the Danube between Straubing and Vilshofen, aiming to increase the possible draught loaded at low navigable water level by 20cm, from 1.60m to 1.80m. In a first step urgent flood prevention measures and selected activities of Variant A…

  • September 26, 2018

    Danube Feasibility Study Phase I. – Technical measures to provide required fairway parameters between rkm 1880.260 and 1708.200 of the Danube

    National project (SK) The project will strengthen the sustainability of water transport between the Slovak Republic and other states on the Danube waterway. At the same time, the feasibility study will undertake a first step towards fulfilling the requirement to complete the construction of the TEN-T core network by 2030.

  • September 24, 2018

    Navigation on the river Tisza and exploring the possibility of construction of a river port at the junction of three borders of Ukraine, Hungary, Slovakia

    National project (UA) This project would improve mobility and communication between different modes of Transport, by establishing the necessary criteria for an international class IV waterway, construction of hydrotechnical structures and construction of a river port. The project would provide direct access to short and therefore cheaper traffic routes (compared to alternative routes) from the…

  • September 18, 2018

    Improving navigability on the Hungarian section of the Danube: extended study to prepare implementation

    National project (HU) The study aims at improving the navigation along the Hungarian section of the Danube by carrying out preparatory studies for the removal of 31 bottlenecks.

  • September 18, 2018

    Hajózzunk a Dunán! – Improvement of the navigability on the Danube in Hungary

    National project (HU) The study was conducted between 2008 and 2011 and aimed to prepare the elimination of fords and bottlenecks on the Hungarian stretch of the Danube (from river-km 1,708 to 1,433).

  • September 17, 2018

    Development and installation of the navigation monitoring and electronic fairway marking system on the Danube River (AtoNs)

    National project (RS) The project’s overall objective is to procure and install the equipment for the navigation monitoring and fairway marking system on the Danube River in Serbia. The new navigation buoys will be allocated on the Danube River in Serbia and will be equipped with AIS AtoN transponders that will enable real-time monitoring of…

  • September 10, 2018

    GrinFleet – Green Inland Fleet

    Transnational project (NL, IT, FR, DE, AT, HU) The project would have resulted in co-modal logistic solutions and vessel solutions (hull configurations, power and propulsion trains, special business cases).

Previous Page
1 2 3 4 5 … 15
Next Page

Newsletter

Sitemap
Contact us
Disclaimer
Privacy policy
Intranet

Image module
div#stuning-header .dfd-stuning-header-bg-container {background-size: initial;background-position: top center;background-attachment: initial;background-repeat: initial;}#stuning-header div.page-title-inner {min-height: 100px;}#main-content .dfd-content-wrap {margin: 0px;} #main-content .dfd-content-wrap > article {padding: 0px;}@media only screen and (min-width: 1101px) {#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars {padding: 0 0px;}#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars > #main-content > .dfd-content-wrap:first-child,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars > #main-content > .dfd-content-wrap:first-child {border-top: 0px solid transparent; border-bottom: 0px solid transparent;}#layout.dfd-portfolio-loop > .row.full-width #right-sidebar,#layout.dfd-gallery-loop > .row.full-width #right-sidebar {padding-top: 0px;padding-bottom: 0px;}#layout.dfd-portfolio-loop > .row.full-width > .blog-section.no-sidebars .sort-panel,#layout.dfd-gallery-loop > .row.full-width > .blog-section.no-sidebars .sort-panel {margin-left: -0px;margin-right: -0px;}}#layout .dfd-content-wrap.layout-side-image,#layout > .row.full-width .dfd-content-wrap.layout-side-image {margin-left: 0;margin-right: 0;}
PA 1A
Manage Consent

To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.

• Page and file requests are generally logged on the server for 14 days.
• Entries in forms are processed electronically by us. Personal data in the forms used to respond to your enquiry ((pre-)contractual communication in accordance with Art. 6 Abs 2 lit b GDPR) is processed.
• Your data protection decision is stored in cookie complianz in your browser for 90 days.

Functionally necessary cookies Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network. The data processing activities undertaken by employing the use of cookies are based on our legitimate interests in providing a fully functioning website and the services requested by you (Article 6(1)(f) GDPR, Section 96 para. 3 of the Telecommunications Act). We use the following cookies: • danube-region.eu web service / WordPress (CMS): necessary to transmit messages and provide the services requested by you. • Cookie consent: this cookie stores the settings you have made as a user in this cookie consent process. • Session cookie: Necessary to uniquely identify your session and, if necessary, to store settings you make on the website or, for example, in a form.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Analysis and statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you. Google Analytics (GA): Google LLC (USA) registers a unique ID that is used to generate statistical data on how visitors use the website. ExactMetrics: MonsterInsights LLC (USA) is a Google Analytics plugin for WordPress websites that simplifies the process of setting up and viewing Google Analytics data directly within the WordPress dashboard.
Embedded content from other websites
Posts on this website may contain embedded content (e.g. videos, images, posts, etc.). Embedded content from other websites behaves exactly as if visitors had visited the other website. These websites may collect data about you, use cookies, embed additional third-party tracking services and record your interaction with this embedded content, including your interaction with the embedded content if you have an account and are logged in to that website.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}