National project (RO) The project foresees further bank protection works on the Sulina Channel (on a length of 36.7 km), in addition to the works already concluded (lenght of 15km).
![]()
National project (RO) The project foresees further bank protection works on the Sulina Channel (on a length of 36.7 km), in addition to the works already concluded (lenght of 15km).
National project (RO) As a consequence of critical points on the Călăraşi – Brăila section of the Danube, vessels must take a bypass route via the Bala–Borcea branch, which extends the navigation distance to around 110 km, for periods of around 140 – 160 days/ year. The project therefore includes river engineering works which will ensure navigation levels on the Old Danube and have a reduced impact on the environment, having effects only during low water seasons.
National project (RO) The main goal of the waiting berth for convoys is to facilitate the convoys’ assembling/dismantling operations, including the assurance of cargo safety as well as the simple vessel’s mooring, and to lower the unit waterway transport cost. The waiting berth is located on the left bank of the Danube–Black Sea Canal, upstream from the junction with the Poarta Albă–Midia Năvodari Canal. It is 300 m long and has three piers and a quay depth of 5.5 m.
National project (HR) The Danube river near the village of Sotin at river-km 1,322 causes erosion of the extremely dilapidated right bank which might result in the undermining and subsequent collapse of the bank. A direct effect of lateral erosion of the river is the decrease of water depths, especially at low-water periods, thus negatively affecting inland waterway transport. The project foresees river engineering measures on this sector (sill and two T-groynes).
National project (HR) The new winter shelter for vessels would be situated in Opatovac and be equipped with all necessary infrastructures. The construction of the winter shelter includes the creation of bank structures, the construction of an additional building and the organization of local waters.
National project (RO) Banks consolidation works along the Poarta Alba-Midia Navodari Canal are being executed in order to ensure the safety of transport on the canal.
National project (RO) Within the project a most complex system in the area of Intelligent Systems of Naval Transport was developed, taking into account that it covers all ports with significant traffic on the Romanian Danube sector.
Proposal for a transnational project (NL, DE, RO) The project intended to address sectoral changes and human issues, specifically needed skills, as a component of wider efforts to make EU ports more competitive and resource-efficient. It intended to feature an analysis of the status quo of formal and informal education and training with respect to port activities, look into future challenges and demands in education and training of port workers and design a roadmap for a European Port Training Policy.
National project (RS) Serbian River Information Services cover the entire stretch of the Danube waterway in Serbia, including cross-border sections which form a crucial part of the system. Implementation of RIS in Serbia is harmonized with the existing RIS systems in Europe.
National project (BG) As EU member state Bulgaria has the obligation to establish a RIS system, which is a part of the trans-European network concerning the technical guidelines for the planning, implementation and operational use of river information services in order to ensure effective and safe navigation on the inland waterways.

To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
• Page and file requests are generally logged on the server for 14 days.
• Entries in forms are processed electronically by us. Personal data in the forms used to respond to your enquiry ((pre-)contractual communication in accordance with Art. 6 Abs 2 lit b GDPR) is processed.
• Your data protection decision is stored in cookie complianz in your browser for 90 days.